divider

You are currently browsing the Beechmere Diary weblog archives for a month.

divider
Categories

Archive for August, 2009

August 19th, 2009

August 14-19 Visit – Cabin Floor

On this visit, we installed 17 posts atop the concrete bases we installed on the last visit and constructed the rim joists and the floor joists. We had a lot of trouble with horse flies that buzz about and can leave a fierce bite. I did take time to look at the pond. The water [...]

divider