June 12- June 14, 2006 Visit
I drove down on Sunday. The main task on this trip was to deal with the spring box leak. I dug out the front of the spring box and 8″ down into the clay and the added 10 40 lb bags of concrete in this trench. The spring was flowing at a rate of eight [...]